FAQ

GENERAL ISSUES

Questions

Answers

Is  there any space available in Perspektiva industrial park?
150 ha
What category of land is it?
Lands of industrial and other special purpose, lands of inhabited areas (inhabited localities), lands of agricultural designation.
What is the cost of rent within the industrial park?
34 000 RUB/ha
What is the cost of purchasing a land plot?
100 000 RUB/ha
Are there any limits for purchasing of a land plot?
Acquisition of a land plot becomes possible when project construction-assembly works are finished and it is put to operation.
How do you purchase a land plot into property?
1 stage. Leasing up to 1 year for the period of project works.

2 stage. Leasing up to 5 years for the period of construction works.

3 stage. Purchase into property when construction works are finished.
Who owns land at present?
Municipal State-Run Enterprise Capital Construction and Service Providing Agency of the Bobrovsky Municipal District of the Voronezh region 
Production of what hazard class can be placed within the territory of the industrial park?
Allowed hazard classes for resident companies, structures or other subjects are 3 - 5
Are there any benefits for residents of the industrial park?
Residents of industrial park may claim the following types of investors’ support:
Granting tax exemptions

- Profit tax relief 

Level of tax relief:

In accordance with the law of the Voronezh Region dated 10/06/2014 № 91-ОЗ deduction of profit tax rate that should be put into regional budget up to 13.5 %

- Property tax relief

Level of tax relief:

In accordance with the law of the Voronezh region dated 10/06/2014 № 91-ОЗ deduction of property tax rate up to 0 % 

- Transport tax relief

Level of tax relief:

In accordance with the law of the Voronezh region dated 11/06/2003 № 28-ОЗ relief from transport tax will be provided
What soil composition does the territory have?
Prevalence of typical mid-humous and mid-deep soil is outstanding for soil surface. Humus content varies from 6.5 to 8.5%.  The majority of soils are characterized by heavy sand-clay and light sand-clay mechanical content.
Is there a minimum level of investment for the industrial park?
None
What are the milestones of investment project implementation within the industrial park?
To complete an investment project it is necessary to take the following steps:

•    Investor’s written request to the Government of the Voronezh region.
•    Preparation of offers on location of land plots for company placement in the territory of the industrial park.
•    Inspection of proposed for company placement sites in the territory of the industrial park.
•    Preparation of application and a package of all necessary documents for consideration if placement is possible in the territory of the industrial park that will be considered at the meeting of Interdepartmental commission on production forces placement in the territory of the Voronezh region.
•    Meeting of Interdepartmental commission on production forces placement in the territory of the Voronezh region.
•    Signing and state registration of the land sublease agreement.
•    Project works implementation.
•    Construction-assembling works.
•    Object commissioning.
•    Purchase of land into property.

ENGINEERING INFRASTRUCTURE

Questions

Answers

What is the  existing electrical power capacity and cost of networks connection?
Total capacity: 220 МW

Free capacity: 110 МW

Substation PS 220/110/35/10 kV Bobrov.

Total capacity:  2 125 МVА transformers, free: 86.4 МVА.
What is the existing capacity of gas distributing networks and cost of networks connection?
Total capacity: 70 000 м³/h

Free capacity: 40 000 м³/h

Gas: Bobrov Automated Gas Distribution Station, (70 k м³/h, on peak load reserve  exceeds 40 k  м³/h)
What is the existing capacity of the water supply system, cost of networks connection?
Total capacity:  from 100 м³/h

Free capacity: from 100 м³/h

City water supply networks. Capacity of waterway with 6 atm pressure: 2 000м3/24 h, pressure increase provides capacity increase.
What is the existing capacity of water disposal system, cost of networks connection?
Total capacity: 5 000 м³/h

Free capacity: 3 000 ³м/h

Who provides telecommunication services (phone and internet)?

What will it cost to connect to networks?
Telecommunication services provided by regional telecommunication operators.

Cost of connection is calculated by service provider’s tariffs.
Are there any plots with railway connection?
In the territory there are railroads termination points 
What is the distance to the nearest railway station?
Along the Southern boarder of Bobrovsky industrial park there is Povolzhie-Ukraine railroad line.

Railroad branch of South-Eastern Rail Road  Liski – Povorino section and a Bitug railroad station situated at a distance of 1km.
What is the distance to the nearest federal highway?
Along the Northern boarder of Bobrovsky industrial park there is the highway of III technical category  М4Don – Bobrov – Talovaya – Novokhopersk. The distance form the М4 Dom – 9km highway.

There is an asphalt road on  the park premises.

SOCIAL INFRASTRUCTURE

Questions

Answers

What are the nearest to the industrial park settlements?
Bobrov urban locality.
What is the number of population living in the area of the industrial park?
Total population number of the Bobrovsky district is 49, 900 people including

Bobrov which is 19 956 people.
What kind of housing and social infrastructure is available for employees of the industrial park?
Number of schools: 21; 

Kindergartens: 22;

Secondary-technical institutions: 4.

Sports complex, advanced central district hospital, advanced central stadium.